disac image 01

DISAC for General Industries

Customer Requirement Specification (Partial)

 

・To construct a low cost NTD Silicon production facility

・Need much more flat neutron flux than the traditional equipments with nuclear reactor to extend the  doping uniformity which dominates semiconductor chip quality.

 
eM Cube Proposal (Excerption)

 

● Datasheet

 

● Outside Demension

Disac Overview

<<DISAC Outline Image>>Graphics from basic design and be subject to change.

 

** The requirement specification of this customer was 2 ports (dual neutron source for irradiation). The system with more irradiation ports can be considered by evaluating their neutron diffraction on demands. Acceleration energy or current can be reviewed and extended for neutron energy of irradiation.

 
Cost and period required for the program execution

 

Cost  : US$ 32,000.-
Period : 90 Days