High Power High Energy Proton Acceleration DISAC

Customer Requirement Specification (Partial)

 

・Accelerate proton more than 1 GeV and maximize acceleration current as possible
・Keep the consumption energy of accelerator less than 1000 KVA at the maximum acceleration current    in operation,
・Output of the accelerator should be a monochrome beam of masimum energy
・Maximum acceleration current should be arbitrarily scalable from 5% to 100%

 
eM Cube Proposal (Excerption)

 

● Datasheet

 

● Outside Demension

<<DISAC Power Station Outline Image>>Graphics from basic design and be subject to change.

 
Cost and period required for the program execution

 

Cost  : US$ 75,500.-
Period : 120 Days